Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Excavation (Adjacent to Underground Services) SWMS 10285-7

Excavation (Adjacent to Underground Services) SWMS 10285-7

Product SKU: 10285
Excavation (Adjacent to Underground Services) SWMS 10285-7 Video

Other Details

PDF Download:
Excavation (adjacent to underground services) SWMS 10285-7_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Supplied in Microsoft Word format.
    • Only pay once (no subscriptions required).

Excavation (Adjacent to Underground Services) SWMS | Safe Work Method Statement

This Excavation (Adjacent to Underground Services) Safe Work Method Statement (SWMS) outlines the general job steps, hazards and controls associated with excavating adjacent to known underground services.

This SWMS includes pre-start and planning, contact with asset owners, traffic and pedestrian control, and emergency procedure in case of contact.

Job Steps Covered in Excavation (Adjacent to Underground Services) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training & Capabilities
  3. Arrival & Assess Onsite Conditions for Operations
  4. Conduct Risk Assessment
  5. Conducting Site Survey
  6. Checking Manholes/Pit Safety
  7. Excavation

Excavation (Adjacent to Underground Services) Safe Work Method Statement Includes:

  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE Requirements
  • Emergency Response
  • Emergency Evacuation Procedure

Instant Document Delivery via Email 

FREE Current OHS Legislation & Codes of Practice Reference List (Value $7.95)

For work carried out on a regular basis a generic Safe Work Method Statement (SWMS) may be prepared and used for those work activities.

Remember: The content of a Safe Work Method Statement (SWMS) should be refined over time and include consultation with workers and other persons conducting a business or undertaking.

Prior to each new activity, each Safe Work Method Statement (SWMS) must be reviewed and revised to ensure they apply to the current work activities and the actual site you are working at.

Go Digital - JSA and SWMS Integration

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...