Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Fencing (Sheet Metal) SWMS 10375-5

Fencing (Sheet Metal) SWMS 10375-5

Product SKU: 10375
Fencing (Sheet Metal) SWMS 10375-5 Video

Other Details

PDF Download:
Fencing (sheet metal) SWMS 10375-5.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Supplied in Microsoft Word format.
    • Only pay once (no subscriptions required).

Fencing (Sheet Metal) SWMS | Safe Work Method Statement

This Fencing (Sheet Metal) Safe Work Method Statement (SWMS) outlines the general hazards associated with the installation of sheet metal fencing at construction sites and properties.

Covered in this SWMS is the delivery of materials, line clearing (earthworks), installation posts, attach panels, construct and hang gates.

Job Steps Covered in Fencing (Sheet Metal) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training & Capabilities
  3. Transporting & Loading Materials
  4. Arrival at Site
  5. General Work Area Set-up
  6. Delivery of Materials & Mobile Plant
  7. Clear the Fence Line
  8. Mark Out the Fence
  9. Digging Post Holes
  10. Setting the Posts
  11. Attaching Panels & Gates
  12. On Completion
  13. Record Keeping/Health Monitoring

Fencing (Sheet Metal) Safe Work Method Statement Includes:

  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE Requirements
  • Emergency Response
  • Emergency Evacuation Procedure

Instant Document Delivery via Email 

FREE Current OHS Legislation & Codes of Practice Reference List (Value $7.95)

For work carried out on a regular basis a generic Safe Work Method Statement (SWMS) may be prepared and used for those work activities.

Remember: The content of a Safe Work Method Statement (SWMS) should be refined over time and include consultation with workers and other persons conducting a business or undertaking.

Prior to each new activity, each Safe Work Method Statement (SWMS) must be reviewed and revised to ensure they apply to the current work activities and the actual site you are working at.

Go Digital - JSA and SWMS Integration

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...