Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Fencing (Steel Post & Rail) SWMS 10592-3

Fencing (Steel Post & Rail) SWMS 10592-3

Product SKU: 10592
Fencing (Steel Post & Rail) SWMS 10592-3 Video

Other Details

PDF Download:
Fencing (steel post and rail) SWMS 10592-3_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Supplied in Microsoft Word format.
    • Only pay once (no subscriptions required).

Fencing (Steel Post & Rail) SWMS | Safe Work Method Statement

This Fencing (Steel Post & Rail) Safe Work Method Statement (SWMS) outlines the general hazards associated with the installation of steel posts and rail fencing. 

Covered in this SWMS is the delivery of materials, line clearing (earthworks), installation posts, cutting and welding rails, construction and hanging of gates. 

Job Steps Covered in Fencing (Steel Post & Rail) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training & Capabilities
  3. Transporting & Loading Materials
  4. Arrival at Site
  5. General Work Area Set-up
  6. Delivery of Materials & Mobile Plant
  7. Clear the Fence Line
  8. Mark Out the Fence
  9. Digging Post Holes
  10. Setting the Posts
  11. Attaching Rails & Gates
  12. On Completion

Fencing (Steel Post & Rail) Safe Work Method Statement Includes:

  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE Requirements
  • Emergency Response
  • Emergency Evacuation Procedure

Instant Document Delivery via Email 

FREE Current OHS Legislation & Codes of Practice Reference List (Value $7.95)

For work carried out on a regular basis a generic Safe Work Method Statement (SWMS) may be prepared and used for those work activities.

Remember: The content of a Safe Work Method Statement (SWMS) should be refined over time and include consultation with workers and other persons conducting a business or undertaking.

Prior to each new activity, each Safe Work Method Statement (SWMS) must be reviewed and revised to ensure they apply to the current work activities and the actual site you are working at.

Go Digital - JSA and SWMS Integration

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...