Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Interior Linings (Plasterboard/Gyprock/Fibre Cement) SWMS 10195-7

Interior Linings (Plasterboard/Gyprock/Fibre Cement) SWMS 10195-7

Product SKU: 10195
Interior Linings (Plasterboard/Gyprock/Fibre Cement) SWMS 10195-7 Video

Other Details

PDF Download:
Interior-Linings-plasterboard-gyprock-fibre-cement-SWMS-10195-7_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Supplied in Microsoft Word format.
    • Only pay once (no subscriptions required).

Interior Linings (Plasterboard/Gyprock/Fibre Cement) SWMS | Safe Work Method Statement

This Interior Linings (Plasterboard/Gyprock/Fibre Cement) Safe Work Method Statement (SWMS) outlines the general safety steps, general hazards and controls associated with the fixing and setting of plasterboard sheets to walls and ceilings in buildings.

This SWMS also covers the application of cornice.

Job Steps Covered in Interior Linings (Plasterboard/Gyprock/Fibre Cement) SWMS:

(includes potential hazards & control measures)

  1. Planning & Preparation
  2. Training & Capabilities
  3. Arrival & assess onsite conditions
  4. Materials delivery
  5. Work area set up
  6. Cutting Linings
  7. Fixing Linings (Follow Manufacturers Instruction for Installation Procedure of the Material)
  8. Applying compounds and fillers
  9. Sanding
  10. On Completion

Interior Linings (Plasterboard/Gyprock/Fibre Cement) Safe Work Method Statement Includes:

  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE Requirements
  • Emergency Response
  • Emergency Evacuation Procedure

Instant Document Delivery via Email 

FREE Current OHS Legislation & Codes of Practice Reference List (Value $7.95)

For work carried out on a regular basis a generic Safe Work Method Statement (SWMS) may be prepared and used for those work activities.

Remember: The content of a Safe Work Method Statement (SWMS) should be refined over time and include consultation with workers and other persons conducting a business or undertaking.

Prior to each new activity, each Safe Work Method Statement (SWMS) must be reviewed and revised to ensure they apply to the current work activities and the actual site you are working at.

Go Digital - JSA and SWMS Integration

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

Write your own product review

Product Reviews


  1. Quick,Efficient,Serves a purpose

    Posted by on

    Easy to access
    Well laid out
    Easy to alter to site specific
    Satisfies the powers to be


  2. Eazy..

    Posted by on

    Good swms .eazy .


$79.95

PLUS GST

View Cart


You May Also Need...