Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Make Safe (Damaged Roof) SWMS 10583-2

Make Safe (Damaged Roof) SWMS 10583-2

Product SKU: 10583
Make Safe (Damaged Roof) SWMS 10583-2 Video

Other Details

PDF Download:
Make Safe (damaged roof) SWMS 10583-2_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Supplied in Microsoft Word format.
    • Only pay once (no subscriptions required).

Make Safe (Damaged Roof) SWMS | Safe Work Method Statement

This Make Safe (Damaged Roof) Safe Work Method Statement (SWMS) provides guidance on making roofs temporarily secure after the roof has been damaged from storm, lightning etc. 

This SWMS covers access to single story buildings via an extension ladder. 

A Falls Emergency Rescue Plan is included in this SWMS.

This SWMS is created in response to the needs of first respondents for ‘making safe’ tasks after an emergency event.

As such, this SWMS may refer to additional high-risk SWMS for further detail.

This SWMS does not cover the specific setup of particular height access equipment. Unless otherwise mentioned in this SWMS a separate, dedicated SWMS will be required for the set-up/erection of height access equipment such as Mobile Scaffold and Fixed ScaffoldsElevated Work Platforms, installing Edge Protection etc.

Job Steps Covered in Make Safe (Damaged Roof) SWMS:

(includes potential hazards & control measures)

  1. Planning & Preparation
  2. Training & Capabilities
  3. Conduct Risk Assessment
  4. Assess On-site Conditions
  5. Minor Roof Repair (e.g. Replacing Tiles or Sheeting or Placing of a Tarp)
  6. Fall From Roof
  7. On Completion

Make Safe (Damaged Roof) Safe Work Method Statement Includes:

  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE Requirements
  • Emergency Response
  • Emergency Evacuation Procedure

Instant Document Delivery via Email 

FREE Current OHS Legislation & Codes of Practice Reference List (Value $7.95)

For work carried out on a regular basis a generic Safe Work Method Statement (SWMS) may be prepared and used for those work activities.

Remember: The content of a Safe Work Method Statement (SWMS) should be refined over time and include consultation with workers and other persons conducting a business or undertaking.

Prior to each new activity, each Safe Work Method Statement (SWMS) must be reviewed and revised to ensure they apply to the current work activities and the actual site you are working at.

Go Digital - JSA and SWMS Integration

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...