Safe & Happy Holidays from SafetyDocs!
Our team are on holiday from 5pm Fri 22nd Dec until 8:30am Tues 2nd Jan (AEST). Our store remains open 24/7 for instant product downloads.

Animated picture of a orange mini loader

Mini Loader Operation Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Mini Loader Safe Work Method Statement

This Mini Loader Safe Work Method Statement (SWMS) covers hazards and controls with the view of ensuring that all reasonbly practicable steps have been taken to prevent the likelihood of incident during the operation of a mini laoder and attachments.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Work in an area that may have a contaminated or flammable atmosphere
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Additional controls are included for Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Out-of-Hours/Night Work, Hazardous Manual Tasks, Outdoor Work, Remotely &/or Isolated Work, Silica Dust & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Mini Loader SWMS:

(includes potential hazards and control measures)

  1. Working Outdoors
  2. Working Alone
  3. Arrival On-site & Assess On-site Conditions
  4. Work Area Set-up
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Delivery, Set-up & Removal of the Machine
  9. Establish a Communication System with Ground Workers
  10. Machine Operation
  11. Lifting the Machine with a Crane or Excavator
  12. Trenching & Digging
  13. Working near the Powered Mobile Plant
  14. Excavating near Underground Services
  15. Working on Residential Properties (children on site)
  16. Changing Attachments
  17. Operations with Hydraulic Attachments
  18. Fuelling the Plant
  19. On Completion
  20. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Mini Loader Safe Work Method Statement

This Mini Loader Safe Work Method Statement (SWMS) covers hazards and controls with the view of ensuring that all reasonbly practicable steps have been taken to prevent the likelihood of incident during the operation of a mini laoder and attachments.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Work in an area that may have a contaminated or flammable atmosphere
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Additional controls are included for Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Out-of-Hours/Night Work, Hazardous Manual Tasks, Outdoor Work, Remotely &/or Isolated Work, Silica Dust & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Mini Loader SWMS:

(includes potential hazards and control measures)

  1. Working Outdoors
  2. Working Alone
  3. Arrival On-site & Assess On-site Conditions
  4. Work Area Set-up
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Delivery, Set-up & Removal of the Machine
  9. Establish a Communication System with Ground Workers
  10. Machine Operation
  11. Lifting the Machine with a Crane or Excavator
  12. Trenching & Digging
  13. Working near the Powered Mobile Plant
  14. Excavating near Underground Services
  15. Working on Residential Properties (children on site)
  16. Changing Attachments
  17. Operations with Hydraulic Attachments
  18. Fuelling the Plant
  19. On Completion
  20. Emergency Response
PDF Download
PDF File

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View