Safe & Happy Holidays from SafetyDocs!
Our team are on holiday from 5pm Fri 22nd Dec until 8:30am Tues 2nd Jan (AEST). Our store remains open 24/7 for instant product downloads.

large underground dug out drainage pipe

Plumbing Drainage Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Plumbing Drainage Safe Work Method Statement

This Plumbing Drainage Safe Work Method Statement (SWMS) covers hazards and controls in regards to the installation of pipes (including UPVC coiled pipes), storm water tanks, polyethylene pipe welding, sewage and stormwater drainage for civil works.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Out-of-Hours/Night Work, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Plumbing Drainage SWMS:

(includes potential hazards and control measures)

  1. Training
  2. Planning
  3. Arrival On-site & Assess On-site Conditions
  4. Working Outdoors
  5. Work Area Set-up
  6. Environment
  7. Housekeeping
  8. Manual Tasks
  9. Materials Delivery
  10. Working with Powered & Non-powered Tools
  11. Working with Cement & Mortar
  12. Excavating & Backfilling
  13. Lifting & Placing Pipes, Tanks & Stormwater Drains into the Excavation
  14. Fixing Pipework, Tanks
  15. Polyethylene Pipe Welding (PPW)
  16. Pressure Testing Pipework
  17. On Completion
  18. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Plumbing Drainage Safe Work Method Statement

This Plumbing Drainage Safe Work Method Statement (SWMS) covers hazards and controls in regards to the installation of pipes (including UPVC coiled pipes), storm water tanks, polyethylene pipe welding, sewage and stormwater drainage for civil works.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Out-of-Hours/Night Work, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Plumbing Drainage SWMS:

(includes potential hazards and control measures)

  1. Training
  2. Planning
  3. Arrival On-site & Assess On-site Conditions
  4. Working Outdoors
  5. Work Area Set-up
  6. Environment
  7. Housekeeping
  8. Manual Tasks
  9. Materials Delivery
  10. Working with Powered & Non-powered Tools
  11. Working with Cement & Mortar
  12. Excavating & Backfilling
  13. Lifting & Placing Pipes, Tanks & Stormwater Drains into the Excavation
  14. Fixing Pipework, Tanks
  15. Polyethylene Pipe Welding (PPW)
  16. Pressure Testing Pipework
  17. On Completion
  18. Emergency Response
PDF Download
PDF File

Hear From Our Customers

  • 5

    Great service, reasonably priced, good product.

    Great service, reasonably priced, good product.

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View