Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Power Pole Temporary Support SWMS 10450-1

Power Pole Temporary Support SWMS 10450-1

Product SKU: 10450
Power Pole Temporary Support SWMS 10450-1 Video

Other Details

PDF Download:
Power Pole Temporary Support SWMS 10450-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Supplied in Microsoft Word format.
    • Only pay once (no subscriptions required).

Power Pole Temporary Support SWMS | Safe Work Method Statement

This Power Pole Temporary Support Safe Work Method Statement (SWMS) covers general hazards associated with supporting a power pole using a crane in the presence of overhead power lines and in close proximity to roads with public vehicular traffic. 

This SWMS includes controls for working adjacent to powerlines, traffic control, planning, preparation and safe work with mobile plant.

Crane pre-start checklist included.

Job Steps Covered in Power Pole Temporary Support SWMS:

(includes potential hazards & control measures)

  1. Planning & Preparation
  2. Training & Capabilities
  3. Arrival On-site
  4. Site Set-up
  5. Select & Inspect Equipment
  6. Pre-operational Assessment
  7. Pole Support
  8. On Completion

Power Pole Temporary Support Safe Work Method Statement Includes:

  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE Requirements
  • Emergency Response
  • Emergency Evacuation Procedure

Instant Document Delivery via Email 

FREE Current OHS Legislation & Codes of Practice Reference List (Value $7.95)

For work carried out on a regular basis a generic Safe Work Method Statement (SWMS) may be prepared and used for those work activities.

Remember: The content of a Safe Work Method Statement (SWMS) should be refined over time and include consultation with workers and other persons conducting a business or undertaking.

Prior to each new activity, each Safe Work Method Statement (SWMS) must be reviewed and revised to ensure they apply to the current work activities and the actual site you are working at.

Go Digital - JSA and SWMS Integration

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...