Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Restumping Houses SWMS 10342-3

Restumping Houses SWMS 10342-3

Product SKU: 10342
Restumping Houses SWMS 10342-3 Video

Other Details

PDF Download:
Restumping Houses SWMS 10342-3_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Supplied in Microsoft Word format.
    • Only pay once (no subscriptions required).

Restumping Houses SWMS | Safe Work Method Statement

This Restumping Houses Safe work Method Statement (SWMS) covers the general hazards for the removal of timber stumps and replacing with concrete or steel stumps. The processes of removal, replacement and excavation are manual and mechanical using jackhammers hand and power tools. Access to stumps is via subfloor or removal of floor boards.

Job Steps Covered in Restumping Houses SWMS:

(includes potential hazards & control measures)

  1. Planning & Preparation
  2. Materials Delivery & Placement
  3. Arrival & Assess On-site Conditions
  4. Site Set-up
  5. Jack the House
  6. Remove & Replacing Stumps & Manual Excavation of Foundations
  7. Setting the Stumps
  8. Jack/Prop Removal
  9. On Completion
  10. Record Keeping/Health Monitoring

Restumping Houses Safe Work Method Statement Includes:

  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE Requirements
  • Emergency Response
  • Emergency Evacuation Procedure

Instant Document Delivery via Email 

FREE Current OHS Legislation & Codes of Practice Reference List (Value $7.95)

For work carried out on a regular basis a generic Safe Work Method Statement (SWMS) may be prepared and used for those work activities.

Remember: The content of a Safe Work Method Statement (SWMS) should be refined over time and include consultation with workers and other persons conducting a business or undertaking.

Prior to each new activity, each Safe Work Method Statement (SWMS) must be reviewed and revised to ensure they apply to the current work activities and the actual site you are working at.

Go Digital - JSA and SWMS Integration

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...