Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Traffic Line Removal (Using Skid Steer Loader) SWMS 10456-2

Traffic Line Removal (Using Skid Steer Loader) SWMS 10456-2

Product SKU: 10456
Traffic Line Removal (Using Skid Steer Loader) SWMS 10456-2 Video

Other Details

PDF Download:
Traffic Line Removal (using Skid Steer Loader) SWMS 10456-2_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Supplied in Microsoft Word format.
    • Only pay once (no subscriptions required).

Traffic Line Removal (Using Skid Steer Loader) SWMS | Safe Work Method Statement

This Traffic Line Removal (Using Skid Steer Loader) Safe Work Method Statement (SWMS) covers general hazards associated with the removal of traffic line markings using a skid steer loader.

Included in this SWMS is planning and preparation, loading and unloading skid steer and attachments, pre-start checks, changing attachments, operational use and maintenance. 

Job Steps Covered in Traffic Line Removal (Using Skid Steer Loader) SWMS:

(includes potential hazards & control measures)

  1. Planning & Preparation
  2. Training & Capabilities
  3. Arrival at Site
  4. Delivery & Removal of Powered Mobile Plant
  5. Establish Traffic Management
  6. Pre-start Check
  7. Changing Attachment
  8. Grinding the Lines
  9. Maintenance On-site
  10. On Completion

Traffic Line Removal (Using Skid Steer Loader) Safe Work Method Statement Includes:

  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE Requirements
  • Emergency Response
  • Emergency Evacuation Procedure

Instant Document Delivery via Email 

FREE Current OHS Legislation & Codes of Practice Reference List (Value $7.95)

For work carried out on a regular basis a generic Safe Work Method Statement (SWMS) may be prepared and used for those work activities.

Remember: The content of a Safe Work Method Statement (SWMS) should be refined over time and include consultation with workers and other persons conducting a business or undertaking.

Prior to each new activity, each Safe Work Method Statement (SWMS) must be reviewed and revised to ensure they apply to the current work activities and the actual site you are working at.

Go Digital - JSA and SWMS Integration

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...