Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Height - Slips, Trips, Falls & Openings SWMS 10

Height - Slips, Trips, Falls & Openings SWMS 10

Product SKU: 10541
Height - Slips, Trips, Falls & Openings SWMS 10 Video

Other Details

PDF Download:
Height_STRO_SWMS_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Falls Prevention Checklist included in SWMS
  • You must have Microsoft Word or iAuditor to use this template

Height - Slips, Trips, Falls & Openings Safe Work Method Statement

This SWMS covers the hazards associated with slips, trips and falls on the same level and falls into openings at construction sites.

For construction industry workers, injuries resulting from slips, trips or falls (STF) are the most common exposures on any site. STF related injuries are the leading cause of worker compensation losses in construction.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Height - Slips, Trips, Falls & Openings SWMS Content: 

  • High Risk Construction Work
    • Working at depths greater than 1.5 Metres, including tunnels or mines
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Conduct a risk assessment
    • Walking / working surfaces
    • Openings, holes and edges
    • Excavations
    • Change in levels (steps and ramps)
  • Falls Prevention Checklist
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


QMS Special
Take $150 OFF Quality Management System Sale.

Add coupon code QUALITY at checkout.

You May Also Need...