Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Manual Handling – Hazardous Manual Tasks SWMS

Manual Handling – Hazardous Manual Tasks SWMS

Product SKU: 10168
Manual Handling – Hazardous Manual Tasks SWMS Video

Other Details

PDF Download:
Manual_Handling_SWMS_Sample_2015.pdf
Product Video:


  • Product Description
  • Product Reviews
  • View Sample
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Instant Download delivered via email
  • MS Word and IAT (iAuditor App) format for easy customisation/editing
  • Downloading and Customising Instructions provided
  • Assists with compliance requirements for WHS inspections
  • Review Date: 30 July 2014

The Manual Handling-lifting Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards, risks and controls associated with Manual handling includes all physical activity. Manual handling tasks only present a risk when they are considered hazardous. Hazardous manual tasks can lead to injuries that are called “Musculoskeletal Injuries” or MSD’s.

The SWMS covers the requirement to identify, assess and control manual handling risks in relation to lifting tasks across numerous industries including construction, manufacturing, hospitality etc. This does not provide specific risk controls in relation to people-handling in health care settings.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Document Format
This Safe Work Method Statement (SWMS) is provided in the following document formats 

iat-word-files.jpg

 

app-store-badge.png google-play-badge.png

This SWMS includes: 

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • Review
  • References
  • Employee sign off section
  • Hierarchy of Controls
  • Risk Assessment Matrix

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.

Product details:

  • Written by ex WHS inspectors
  • Easy customisation with MS Word format (NOT PDF)
  • Risk ratings before and after control measures
  • Provides a framework for training workers
  • Can be used as part of tender applications, WHS inductions, and Toolbox talks

You may also need:

Hazardous Manual Tasks Module - Ensure your workers clearly understand their safety obligations when it comes to hazardous manual work activities. Contains a policy and procedure.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart

You May Also Need...