Concrete Sawing and Core Drilling Safe Work Method Statement
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Microsoft Word Format (Fully editable).
- Only pay once (no subscriptions required).
Concrete Sawing and Core Drilling Safe Work Method Statement
This Concrete Sawing and Core Drilling Safe Work Method Statement (SWMS) covers hazards and controls associated with using a hand held, electric or petrol/diesel powered concrete saw and core drill.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Mobile plant movement
- Work in an area that may have a contaminated or flammable atmosphere
Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.
Job Steps Covered in Concrete Sawing and Core Drilling SWMS:
(includes potential hazards and control measures)
- Training
- Planning
- Arrival On-site & Assess On-site Conditions
- Work Area Set-up
- Environment
- Working Outdoors
- Housekeeping
- Manual Tasks
- Cutting/Drilling
- Refuelling Equipment
- Servicing Equipment
- On Completion
- Emergency Response
We've recently reviewed and updated our silica dust controls in line with the new 2023 Code of Practice for Silica Dust hazards in the construction industry. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Microsoft Word Format (Fully editable).
- Only pay once (no subscriptions required).
Concrete Sawing and Core Drilling Safe Work Method Statement
This Concrete Sawing and Core Drilling Safe Work Method Statement (SWMS) covers hazards and controls associated with using a hand held, electric or petrol/diesel powered concrete saw and core drill.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Mobile plant movement
- Work in an area that may have a contaminated or flammable atmosphere
Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.
Job Steps Covered in Concrete Sawing and Core Drilling SWMS:
(includes potential hazards and control measures)
- Training
- Planning
- Arrival On-site & Assess On-site Conditions
- Work Area Set-up
- Environment
- Working Outdoors
- Housekeeping
- Manual Tasks
- Cutting/Drilling
- Refuelling Equipment
- Servicing Equipment
- On Completion
- Emergency Response
We've recently reviewed and updated our silica dust controls in line with the new 2023 Code of Practice for Silica Dust hazards in the construction industry. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.