Loading... Please wait...

Plumbing - Suspended Sanitary Waste Installation SWMS

Plumbing - Suspended Sanitary Waste Installation SWMS

Plumbing - Suspended Sanitary Waste Installation SWMS Video

Other Details

PDF Download:
Suspended_Sanitary_Waste_Work_Method_Statement_(SWMS)_V8.pdf


  • Product Description
  • Product Reviews
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Instant Download delivered via email
  • MS Word format for easy customisation/editing
  • Downloading and Customising Instructions provided
  • Assists with compliance requirements for WHS inspections
  • Review Date: 10 July 2014

Installation of Suspended Sanitary Waste by plumbers requires Appropriate Safety Procedures to be used. This Suspended Sanitary Waste Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards, risks and controls for Suspended Sanitary Waste.


Suspended Sanitary Waste is the plumbing process of laying the suspended PVC waste piping to multi level premises or on the roof of concrete basements. All Plumbers installing Sanitary Waste are required to implement a Safe Work Method Statement.

This SWMS includes: 

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • Review
  • References
  • Employee sign off section
  • Hierarchy of Controls
  • Risk Assessment Matrix

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.

Product details:

  • Written by ex WHS inspectors
  • Easy customisation with MS Word format (NOT PDF)
  • Risk ratings before and after control measures
  • Provides a framework for training workers
  • Can be used as part of tender applications, WHS inductions, and Toolbox talks
Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart

You May Also Need...

 


ABOUT SSL CERTIFICATES
Need Help?

Can't find what you're looking for?

Call our customer service team

1300 306 604
Contact us via Email

Customer Service Availability
Mon-Fri 8:00am to 5:00pm AEST