Loading... Please wait...

Scaffolding - Working on

Scaffolding - Working on

Scaffolding - Working on Video

Other Details

PDF Download:
Scaffolding_ Workingon_SWMS_SAMPLE_2015.pdf


  • Product Description
  • Product Reviews
Instant Download Delivery
  • Provides a framework for training workers
  • Addresses generic risks and hazards
  • MS Word format allows you to make changes to the document
  • Can be used as part of tender applications, WHS inductions, and Toolbox talks
  • Assists with compliance requirements for WHS inspections
  • Review Date: 14 March 2014

The Using Scaffolding Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps associated with working on a scaffold.

This SWMS does not cover the specific operation of:

-       Elevated Work Platforms (e.g. Cherry pickers, scissor lifts)

-       Erecting or dismantling scaffolding,

-       Attaching restraints

-       Installation of edge protection

Due to the high-risk nature of working at height, specific SWMS will need to be implemented for these tasks prior to commencing the activity.

Work involving a risk of a person falling more than two metres, is defined as “High Risk Construction Work” by Work Health and Safety Regulations 2011.

This SWMS includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • Review
  • References

This SWMS is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall WHS System.

Product Details:

  • Written by ex WHS inspectors
  • Referenced
  • Risk ratings before and after control measures
  • MS Word format NOT PDF
  • Task specific and site specific details easy to add
  • Includes easy to complete boxes for Company details and project details
  • Employee sign off section

Related items:

  • Manual Handling – Hazardous Manual Tasks
  • Scaffolding – Modular – Erecting
  • Scaffolding – Trestle
  • Heights – Safe work at

Product extract:

Using equipment:

-       Never carry items in hand when using scaffold ladders

-       Light tools are securely fixed on tool belt or shoulder bag

-       Use mechanical means to lower or raise heavier items

-       If using hand lines ensure item is tied to hang vertically to limit snagging

-       If using gin wheels, load does not exceed 50kg

-       If passing equipment from one level to the next use two hands to pass item (maintain communication with team member to know when passing and when to release item)

-       Never drop items from scaffold

-       Use tether on tools /equipment where appropriate to prevent object falling

Use only ladders provided for access to scaffolds:

-       When working on a ladder, do not over-reach. Descend ladder and re-position as required.

-       Do not carry materials when ascending / descending a ladder.

-       Always face ladder when using

-       Do not use step ladders to gain extra height

-       Remove ground level ladder when unattended to prevent unauthorised access

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart

You May Also Need...

 


ABOUT SSL CERTIFICATES
Need Help?

Can't find what you're looking for?

Call our customer service team

1300 306 604
Contact us via Email

Customer Service Availability
Mon-Fri 8:00am to 5:00pm AEST