Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Heavy Vehicles - Maintenance SWMS

Heavy Vehicles - Maintenance SWMS

Product SKU: 10085
Heavy Vehicles - Maintenance SWMS Video
  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Instant Download delivered via email
  • MS Word and IAT (iAuditor App) format for easy customisation/editing
  • Downloading and Customising Instructions provided
  • Assists with compliance requirements for WHS inspections
  • Review Date: 14 March 2014

The Heavy Vehicles - Maintenance Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards, risks and controls associated with maintenance on heavy vehicles. This SWMS covers aspects of earth moving machinery and equipment maintenance undertaken at sites such as a construction site or farm.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Document Format
This Safe Work Method Statement (SWMS) is provided in the following document formats 

 iat-word-files.jpg

app-store-badge.png google-play-badge.png

This SWMS includes: 

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • Review
  • References
  • Employee sign off section
  • Hierarchy of Controls
  • Risk Assessment Matrix

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.

Product details:

  • Written by ex WHS inspectors
  • Easy customisation with MS Word format (NOT PDF)
  • Risk ratings before and after control measures
  • Provides a framework for training workers
  • Can be used as part of tender applications, WHS inductions, and Toolbox talks

Related Items:

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


Site Safety Plans Special
Save with 30% off Site Safety Management Plans.

Add coupon code SSMP30 at checkout.

You May Also Need...