Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Remote and Isolated Areas - Work in SWMS

Remote and Isolated Areas - Work in SWMS

Product SKU: 10336
Remote and Isolated Areas - Work in SWMS Video

Other Details

PDF Download:
Isolation_Remote_Areas_Work_Method_Statement_(SWMS)_V8


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Instant Download delivered via email
  • MS Word and IAT (iAuditor App) format for easy customisation/editing
  • Downloading and Customising Instructions provided
  • Assists with compliance requirements for WHS inspections
  • Review Date: 14 March 2014

The Remote – Isolated Work Safe Work Method Statement (SWMS) is a comprehensive procedure outlining the safety steps for working in isolation (alone).

The Remote - Isolated Work, Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall WHS System.

Emergency situations may arise because of the sudden onset of a medical condition; work-related injury or disease; attack by an animal; exposure to the elements; or by becoming stranded without food or water. The consequences are potentially fatal for people 'working alone' and unable to get immediate assistance from colleagues or other people.

The Remote - Isolated Work, Work Method Statement can be used as part of your WHS inductions, for Tool box talks or tender applications.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Document Format
This Safe Work Method Statement (SWMS) is provided in the following document formats 

iat-word-files.jpg

app-store-badge.png   google-play-badge.png

The Remote - Isolated Work SWMS includes:

  • PPE
  • Safety Notes
  • Personnel Requirements
  • Planning
  • Working
  • Completion
  • References

Related items:

  • Manual Handling – Hazardous Manual Tasks
  • Heat Stress
  • Remote Area Work Guide
  • Remote Area Four Wheel Driving
  • Planning: (extract only)

Agree on location, duration and expected return time. Establish communication frequency based on severity of risk. Establish an emergency response plan for man-down situation (eg: worker fails to meet communication frequency)

Document the above information, eg:

  • safe worth method for task
  • person nominated for communication
  • location, duration and return time
  • frequency of communication
  • emergency response plan

Ensure:

  • communication devices supplied are working and fully charged (mobile phone and EPIRB)
  • communication devices are kept on worker at all times
  • suitable first aid equipment provided
  • transport vehicle is suitable
  • adequate food and water is available
Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


Site Safety Plans Special
Save with 30% off Site Safety Management Plans.

Add coupon code SSMP30 at checkout.

You May Also Need...