Safe & Happy Holidays from SafetyDocs!
Our team are on holiday from 5pm Fri 22nd Dec until 8:30am Tues 2nd Jan (AEST). Our store remains open 24/7 for instant product downloads.

Automatic gate
Automatic Gate Installation Safe Work Method Statement Document Mockup
Automatic gate
Automatic Gate Installation Safe Work Method Statement Document Mockup

Automatic Gate Installation Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Automatic Gate Installation Safe Work Method Statement

This Automatic Gate Installation Safe Work Method Statement (SWMS) covers hazards and controls associated with the installation of an automatic gate using hand and power tools.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hot Work, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

Automatic Gate Risk Assessment Form

Making your workplace safer is easy with a Risk Matrix built into your SWMS

Just use our handy risk assessment matrix to identify the potential hazards associated with installing an automatic gate, then follow our step-by-step controls to mitigate those risks.

With SafetyDocs, you can have peace of mind knowing that your safety is always a top priority.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Automatic Gate Installation SWMS:

(includes potential hazards & control measures).

  1. Provide Training on the Health Effects associated with Respirable Crystalline Silica Dust
  2. Working Outdoors
  3. Arrival On-site & Assess On-site Conditions
  4. Work Area Set-up
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Working with Powered & Non-powered Tools
  9. Hazardous Substance/Chemical Use
  10. Working at Height on Ladders, Trestles & Mobile Scaffold
  11. Fixings & Gate Installation
  12. On Completion
  13. Emergency Response

 

We've recently reviewed and updated our silica dust controls in line with the new 2023 Code of Practice for Silica Dust hazards in the construction industry. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Automatic Gate Installation Safe Work Method Statement

This Automatic Gate Installation Safe Work Method Statement (SWMS) covers hazards and controls associated with the installation of an automatic gate using hand and power tools.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers
  • Work in an area that may have a contaminated or flammable atmosphere

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hot Work, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

Automatic Gate Risk Assessment Form

Making your workplace safer is easy with a Risk Matrix built into your SWMS

Just use our handy risk assessment matrix to identify the potential hazards associated with installing an automatic gate, then follow our step-by-step controls to mitigate those risks.

With SafetyDocs, you can have peace of mind knowing that your safety is always a top priority.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Automatic Gate Installation SWMS:

(includes potential hazards & control measures).

  1. Provide Training on the Health Effects associated with Respirable Crystalline Silica Dust
  2. Working Outdoors
  3. Arrival On-site & Assess On-site Conditions
  4. Work Area Set-up
  5. Environment
  6. Housekeeping
  7. Manual Tasks
  8. Working with Powered & Non-powered Tools
  9. Hazardous Substance/Chemical Use
  10. Working at Height on Ladders, Trestles & Mobile Scaffold
  11. Fixings & Gate Installation
  12. On Completion
  13. Emergency Response

 

We've recently reviewed and updated our silica dust controls in line with the new 2023 Code of Practice for Silica Dust hazards in the construction industry. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.

PDF Download
PDF File

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View