Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604
20% OFF ALL SWMS & SOPS!!!! Ends 5pm 31st July 2017. Enter coupon SAVE20% at checkout.

Pit Cover Raising SWMS 10

Product SKU: 10546
Pit Cover Raising SWMS 10 Video

Other Details

PDF Download:
PitCover_Raising_SWMS_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Pit Cover (Sewer - Stormwater - Water Valve) Raising Safe Work Method Statement

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with the installation / raising of Sewer Pit Covers, Storm Water Pit Cover & Water Valve Covers.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.  

Pit Cover (Sewer - Stormwater - Water Valve) Raising SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Tilt up or pre-cast concrete
    • Work carried out adjacent to a road, railway or shipping lane, traffic corridor
    • Work in an area that may have a contaminated or flammable atmosphere
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Vehicle prestart and use
    • Assess onsite conditions
    • Work area set up
    • Loading / Unloading equipment and materials from vehicle
    • Working near mobile plant
    • Demolition saw
    • Air compressor / jackhammer use
    • Removing / setting covers
    • Refuelling small engine equipment on site (saw etc.)
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring  

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...