Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Air Conditioner Installation (Ducted) New Construction SWMS 10

Air Conditioner Installation (Ducted) New Construction SWMS 10

Product SKU: 10005
Air Conditioner Installation (Ducted) New Construction SWMS 10 Video

Other Details

PDF Download:
AirConditioning_ducted_newconstruction_SWMS_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or SafetyCulture iAuditor to use this template

Air Conditioner Installation (Ducted) - New Construction Safe Work Method Statement

This Safe Work Method Statement (SWMS) outlines the safety steps, general hazards and controls associated with new ducted air-conditioning system installations in buildings under construction.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.  

Air Conditioner Installation (Ducted) - New Construction SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services 
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Assess onsite conditions
    • Work area set up
    • Materials Delivery
    • Outdoor/Indoor units
    • Installing duct work & refrigerant lines
    • Joining refrigerant lines
    • Electrical fit off
    • Commission appliances
    • Testing & Commissioning
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring  

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


  1. Best Yet

    Posted by on

    Set out in a easy to understand and read manner. LOVE the phone app it is exactly what I required. Top Job


$79.95

PLUS GST

View Cart


Site Safety Plans Special
Save with 30% off Site Safety Management Plans.

Add coupon code SSMP30 at checkout.

You May Also Need...