Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Air Conditioning (Existing Premises) SWMS 10573-3

Air Conditioning (Existing Premises) SWMS 10573-3

Product SKU: 10573
Air Conditioning (Existing Premises) SWMS 10573-3 Video

Other Details

PDF Download:
Air Conditioning (existing premises)_SWMS_10573-3_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Air Conditioning Existing Premises Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) covers generic safety steps, hazards and controls associated with the installation of ducted and split system air conditioning

Job Steps Covered in Air Conditioning Existing Premises SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess onsite conditions
  4. Work area setup
  5. Materials Delivery
  6. Lifting units into/out of position with crane
  7. Indoor units (ceiling spaces)
  8. Outdoor / Indoor units
  9. Installing ductwork &/or refrigerant lines
  10. Joining refrigerant lines
  11. Testing & commissioning
  12. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...