Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Asbestos Safe Handling (< 10 sqm.) SWMS 10388-5

Asbestos Safe Handling (< 10 sqm.) SWMS 10388-5

Product SKU: 10388
Asbestos Safe Handling (< 10 sqm.) SWMS 10388-5 Video

Other Details

PDF Download:
Asbestos (_ 10 sqm.) SWMS 10388-5_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
    • Instant Download via Email on order completion.
      • Add your logo easily.
      • Add or delete information to any SWMS template.
      • Instructions on customisation provided.
      • Complies with current legislation in all Australian States/Territories and New Zealand.
      • Supplied in Microsoft Word format.
      • Only pay once (no subscriptions required).

Asbestos Safe Handling (< 10 sqm.) SWMS SWMS | Safe Work Method Statement

This Asbestos Safe Handling (< 10 sqm.) SWMS provides guidance on working with or removing small amounts non-friable asbestos less than 10 m2 in area. (No licence required).

This SWMS should be used for minor work in which asbestos or asbestos-containing materials (ACM) are encountered in the workplace. Examples may be drilling into, painting or replacing a small section of non-friable asbestos sheeting wall or removing non-friable asbestos lagging for a pipe repair.

This SWMS does not cover the removal of friable asbestos, or non-friable asbestos greater than 10sqm, or working with asbestos friction materials such as brake pads.

Job Steps covered in Asbestos Safe Handling (< 10 sqm.) SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training & Capabilities
  3. Assess On-site Conditions
  4. Prepare The Work Area
  5. Removing Small Sections (<10sqm) of ACM, i.e. Asbestos Wall Cladding, Roofing Materials etc.
  6. Drilling Asbestos
  7. Paint/Repaint ACM
  8. Disposing of Asbestos Waste
  9. On Completion

jsa-iauditor.png

We're here to help if you need us!

We give you support just call 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...