Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Asbestos (Safe Handling) SWMS 10388-1

Asbestos (Safe Handling) SWMS 10388-1

Product SKU: 10388
Asbestos (Safe Handling) SWMS 10388-1 Video

Other Details

PDF Download:
asbestos_safe_handling_swms_10.1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Asbestos - Safe Handling Safe Work Method Statement Scope:

This SWMS provides guidance on working with or removing small amounts non-friable asbestos less than 10 m2 in area. (No licence required). This SWMS should be used for minor work in which asbestos or asbestos-containing materials (ACM) are encountered in the workplace. Examples may be drilling into, painting or replacing a small section of non-friable asbestos sheeting wall or removing non-friable asbestos lagging for a pipe repair.

This SWMS does not cover the removal of friable asbestos, or non-friable asbestos greater than 10sqm, or working with asbestos friction materials such as brake pads. 

Suitable for NSW, QLD, SA, TAS, NT and ACT only - Click here to view the Victorian SWMS

Job Steps Covered in Asbestos - Safe Handling SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess onsite conditions
  4. Prepare the work area
  5. Removing small sections (<10sqm) of ACM, i.e. asbestos wall cladding, roofing materials etc.
  6. Drilling asbestos
  7. Paint / repaint ACM
  8. Disposing of asbestos waste
  9. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...