Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Battery Charging (Electric Vehicle) SWMS 10348-3

Battery Charging (Electric Vehicle) SWMS 10348-3

Product SKU: 10348
Battery Charging (Electric Vehicle) SWMS 10348-3 Video

Other Details

PDF Download:
battery_charging_electric_vehicles_swms_10348-3_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Battery Charging - Electric Vehicle Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with general precautions when working with covers the repair, servicing and charging of Electrical Vehicle Batteries.

Job Steps Covered in Battery Charging - Electric Vehicle SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Battery storage
  4. Repair, maintenance, servicing & charging of electrical vehicle batteries
  5. Battery disposal


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...