Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Boating Safety SWMS 10026-4

Boating Safety SWMS 10026-4

Product SKU: 10026
Boating Safety SWMS 10026-4 Video

Other Details

PDF Download:
boating_safety_swms_10026-4_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • SWMS includes a Boating Itinerary Work Plan
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Boating Safety Safe Work Method Statement

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with boating safety. It is for use by workers engaged in work activities on a boat/vessel required to enter and work on water bodies. Tasks carried out on the vessel, or general workplace shall require a SWMS specific to that work. 

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Boating Safety SWMS Content: 

  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Assess the vessel before launch
    • Pre-start check
    • Launching the vessel from ramp
    • Vessel Operation
    • Refuelling
    • On Completion
  • Boating Itinerary Work Plan
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...