Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Brick - Tile Elevator SWMS 10428-1

Brick - Tile Elevator SWMS 10428-1

Product SKU: 10428
Brick - Tile Elevator SWMS 10428-1 Video

Other Details

PDF Download:
Brick - Tile Elevator SWMS 10428-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Brick - Tile Elevator Safe Work Method Statement Scope:

This SWMS covers the delivery, setup and operation of a Brick or Tile Elevator on site. Included in this SWMS is preparation and planning, transport, safe operation and maintenance of the elevator.

Job Steps Covered in Brick - Tile Elevator SWMS: 

 (includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Pre-start check (transport vehicle & trailer)
  4. Delivery and removal of Elevator
  5. Arrival Onsite
  6. Elevator setup and removal
  7. Elevator Operation
  8. Daily maintenance on site
  9. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...