Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Ceiling (Suspended Grid System) Installation SWMS 10043-5

Ceiling (Suspended Grid System) Installation SWMS 10043-5

Product SKU: 10043
Ceiling (Suspended Grid System) Installation SWMS 10043-5 Video

Other Details

PDF Download:
Ceiling (Suspended Grid System) Installation SWMS 10043-5_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
  • Instant Download via Email on order completion.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Supplied in Microsoft Word format.
    • Only pay once (no subscriptions required).

Ceiling (Suspended Grid System) Installation SWMS | Safe Work Method Statement

This Ceiling (Suspended Grid System) Installation Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with the installation of a basic suspended ceiling grid system with drop-in tiles, using ladders and trestles. 

For any work at heights over 2m (e.g. EWP, scaffolding etc.) a dedicated SWMS relating to these tasks should be used.

Job Steps Covered in Ceiling (Suspended Grid System) Installation SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training & Capabilities
  3. Assess On-site Conditions
  4. Delivery, Unloading & Storage of Ceiling Materials
  5. Work Area Set-up
  6. Ceiling Hanger & Tile Installation Following Manufacturer’s Instructions
  7. On Completion
  8. Record Keeping/Health Monitoring

For work carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of a SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking.

Prior to each new activity, each SWMS must be reviewed and revised to ensure they apply to the current work activities and the actual site you are working at.

jsa-iauditor.png

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...