Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Ceiling (Suspended Grid System) Installation SWMS 10043-5

Ceiling (Suspended Grid System) Installation SWMS 10043-5

Product SKU: 10043
Ceiling (Suspended Grid System) Installation SWMS 10043-5 Video

Other Details

PDF Download:
Ceiling (Suspended Grid System) Installation SWMS 10043-4_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Ceiling (Suspended Grid System) Installation Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with the installation of a basic suspended ceiling grid system with drop-in tiles, using ladders and trestles. For any work at heights over 2m (e.g. EWP, scaffolding etc.) a dedicated SWMS relating to these tasks should be used.

Job Steps Covered in Ceiling (Suspended Grid System) Installation SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess onsite conditions
  4. Delivery, unloading & storage of ceiling materials
  5. Work area set up
  6. Ceiling hanger & tile installation following manufacturers instructions
  7. On Completion
  8. Record Keeping/ Health Monitoring

godigital-digitaljsa-bannerforswmspages-v3.png 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...