Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Cleaning (Mould Remediation) SWMS 10634-1

Cleaning (Mould Remediation) SWMS 10634-1

Product SKU: 10634
Cleaning (Mould Remediation) SWMS 10634-1 Video

Other Details

PDF Download:
Cleaning (mould remediation) SWMS 10634-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Cleaning (Mould Remediation) Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) deals with general hazards associated with conducting Mould Remediation works after weather event or from another unexpected water source causing mould growth. Included in this SWMS is planning and preparation, training, general duties associated with the task, public safety and working at heights. 

Job Steps Covered in Cleaning (Mould Remediation) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival at site
  4. Set up work area
  5. Mould removal
  6. Handling and disposing of contaminated waste
  7. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...