Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Communications (Cable Hauling) SWMS 10382-4

Communications (Cable Hauling) SWMS 10382-4

Product SKU: 10382
Communications (Cable Hauling) SWMS 10382-4 Video

Other Details

PDF Download:
communications_cable_hauling_swms_10382-4_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Communications - Cable Hauling Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is pre-filled with general safety steps, hazards and controls associated with cable hauling. This SWMS covers the planning, preparation and operation involved with hauling cable adjacent to roads and, working in a pit or manhole. Work carried out near or in a Confined Space is defined as a High Risk Activity under s291 of the Work Health and Safety Regulations 2011. 

Job Steps Covered in Communications - Cable Hauling SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Travel to/from sites
  4. Assess onsite conditions
  5. Work area set up
  6. Loading / unloading equipment and materials from vehicle
  7. Access manhole / pit
  8. Blowing rope/rods
  9. Pulling cable
  10. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...