Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Communications - IT Installation SWMS 10482-1

Communications - IT Installation SWMS 10482-1

Product SKU: 10482
Communications - IT Installation SWMS 10482-1 Video

Other Details

PDF Download:
communications_-_it_installation_swms_10482-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Communications - IT Installation Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with installation of Information Technology (IT) systems. Covered in this SWMS is cable and lead installation, manual handling, hazardous materials, working in ceilings and working on ladders. This SWMS includes installation works on construction sites and existing domestic dwellings.  

Job Steps Covered in Communications - IT Installation SWMS

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival onsite
  4. Materials Delivery
  5. Work area set up
  6. New equipment -electrical testing
  7. Running cables/setting up equipment
  8. Lifting, mounting & installing components into position
  9. Test equipment is functional
  10. On completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...