Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Pit Cover (Sewer - Stormwater - Water Valve) Raising SWMS 10546-3

Pit Cover (Sewer - Stormwater - Water Valve) Raising SWMS 10546-3

Product SKU: 10546
Pit Cover (Sewer - Stormwater - Water Valve) Raising SWMS 10546-3 Video

Other Details

PDF Download:
Pit Cover (sewer- stormwater-water valve) Raising SWMS 10546-3_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
 
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Pit Cover (Sewer - Stormwater - Water Valve) Raising Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with the installation/raising of Sewer Pit Covers, Storm Water Pit Cover & Water Valve Covers. This includes planning and preparation, environmental controls, working adjacent to mobile plant, training and communications, operational controls and exposure to Respirable Crystalline Silica (RCS) dust.

Job Steps Covered in Pit Cover (Sewer - Stormwater - Water Valve) Raising SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival at site
  4. Work area set up
  5. Cutting & removal asphalt/concrete
  6. Removing covers
  7. Setting covers
  8. Refuelling small engine equipment on site (saw etc.)
  9. On Completion

Click here to view a sample of the Pit Cover (Sewer - Stormwater - Water Valve) Raising SWMS

 

We're here to help if you need us!

We give you support by calling 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

godigital-digitaljsa-bannerforswmspages-v3.png 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...