Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Concrete Formwork (Decks) SWMS 10518-2

Concrete Formwork (Decks) SWMS 10518-2

Product SKU: 10518
Concrete Formwork (Decks) SWMS 10518-2 Video

Other Details

PDF Download:
Concrete Formwork (deck) SWMS 10518-2_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Concrete Formwork (Decks) Safe Work Method Statement

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards, risks and controls associated with carrying out work that involves formwork for Suspended Decks using traditional methods. This includes the delivery, storage, constructing, erecting and stripping these form types.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.  

Concrete Formwork (Decks) SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Structures or buildings involving structural alterations or repairs that require temporary support to prevent collapse
    • Involves a risk of a person falling more than 2m, including work on telecommunications towers
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Formwork Design
    • Training and Capabilities
    • Assess onsite conditions
    • Work area setup
    • False Decks
    • Erecting Frames (including base plates and U heads)
    • Installing bearers and joists
    • Laying formwork on deck
    • Applying bond breakers (if applicable)
    • Concrete Pour
    • Stripping formwork (planning)
    • Stripping formwork (above deck)
    • Stripping formwork (below deck and false deck)
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at. or works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...