Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Concrete Foundations (Excavating and Pouring) SWMS 10522-3

Concrete Foundations (Excavating and Pouring) SWMS 10522-3

Product SKU: 10522
Concrete Foundations (Excavating and Pouring) SWMS 10522-3 Video

Other Details

PDF Download:
Concrete Foundations (excavating pouring) SWMS 10522-3_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
 
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Concrete Foundation (Excavating & Pouring) Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards and controls associated with the excavation, steel setting and pouring concrete foundations/footings.

This SWMS does not cover working in trenches greater than 1.5 metres deep, click here to view a SWMS for that.  

Job Steps Covered in Concrete Foundation (Excavating & Pouring) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival & assess onsite conditions
  4. Work area setup
  5. Delivery of materials (steel reinforcement)
  6. Setting out / profiling building lines
  7. Excavating foundations
  8. Setting trench steel reinforcement
  9. Concrete pumping
  10. Pouring concrete
  11. Setting starter bars/column bolts etc
  12. Refuelling small engine equipment on site (vibrator etc)
  13. On Completion

Click here to view a sample of the Concrete Foundation (Excavating & Pouring) SWMS

 

We're here to help if you need us!

We give you support by calling 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

godigital-digitaljsa-bannerforswmspages-v3.png 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...