Concrete Boom or Line Pumping Safe Work Method Statement
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Microsoft Word Format (Fully editable).
- Only pay once (no subscriptions required).
Concrete Boom or Line Pumping Safe Work Method Statement
This Concrete Boom or Line Pumping Safe Work Method Statement (SWMS) covers hazards and controls associated with the operation of truck mounted concrete boom and line pumps.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Mobile plant movement
- Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
- Work in an area that may have a contaminated or flammable atmosphere
- Work carried out adjacent to a road, railway or shipping lane, traffic corridor
Additional controls are included for Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.
Concrete Pump Risk Assessment
Concrete boom and line pumps can be dangerous equipment if not operated safely. That's why all of our Safe Work Method Statements include a Risk Assessment matrix.
This document is tailored specifically for your industry, so you can rate your risk right in the SWMS and ensure you're meeting all safety requirements.
With SafetyDocs SWMS, you can rest assured that your crew is working with the utmost safety in mind.
Job Steps Covered in Concrete Boom or Line Pumping SWMS:
(includes potential hazards and control measures)
- Planning
- Road Operation
- Working Outdoors
- Arrival On-site & Assess On-site Conditions
- Pump/Line/Boom Set-up
- Environment
- Housekeeping
- Manual Tasks
- Working Near Powered Mobile Plant
- Hazardous Substance/Chemical Use (e.g. cement powder, hydrochloric acid, & diesel fuel)
- Concrete Pour
- Clearing Line Blockages
- Cleaning Out Pump Lines with Compressed Air
- On Completion
- Emergency Response
We've recently reviewed and updated this SWMS in line with the new Code of Practice for managing risks of plant in the workplace. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.
- Instant Document Delivery via Email.
- Add your logo easily.
- Add or delete information to any SWMS template.
- Customisation instructions provided.
- Complies with Australian & New Zealand legislation.
- Microsoft Word Format (Fully editable).
- Only pay once (no subscriptions required).
Concrete Boom or Line Pumping Safe Work Method Statement
This Concrete Boom or Line Pumping Safe Work Method Statement (SWMS) covers hazards and controls associated with the operation of truck mounted concrete boom and line pumps.
This SWMS covers High-Risk Construction Work (HRCW) controls related to:
- Mobile plant movement
- Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
- Work in an area that may have a contaminated or flammable atmosphere
- Work carried out adjacent to a road, railway or shipping lane, traffic corridor
Additional controls are included for Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.
Concrete Pump Risk Assessment
Concrete boom and line pumps can be dangerous equipment if not operated safely. That's why all of our Safe Work Method Statements include a Risk Assessment matrix.
This document is tailored specifically for your industry, so you can rate your risk right in the SWMS and ensure you're meeting all safety requirements.
With SafetyDocs SWMS, you can rest assured that your crew is working with the utmost safety in mind.
Job Steps Covered in Concrete Boom or Line Pumping SWMS:
(includes potential hazards and control measures)
- Planning
- Road Operation
- Working Outdoors
- Arrival On-site & Assess On-site Conditions
- Pump/Line/Boom Set-up
- Environment
- Housekeeping
- Manual Tasks
- Working Near Powered Mobile Plant
- Hazardous Substance/Chemical Use (e.g. cement powder, hydrochloric acid, & diesel fuel)
- Concrete Pour
- Clearing Line Blockages
- Cleaning Out Pump Lines with Compressed Air
- On Completion
- Emergency Response
We've recently reviewed and updated this SWMS in line with the new Code of Practice for managing risks of plant in the workplace. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.