Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Construction Site Visitor SWMS 10071-4

Construction Site Visitor SWMS 10071-4

Product SKU: 10071
Construction Site Visitor SWMS 10071-4 Video

Other Details

PDF Download:
construction_site_visitor_swms_10__44552_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Construction Site Visitor Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with the general construction hazards a person (other than construction worker) may encounter when visiting a construction site to inspect works, check faults, take measurements for materials, perform rescues (paramedical services), wildlife rescue, dealing with the public (visitor) etc.

Job Steps Covered in Construction Site Visitor SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival at site
  4. Assess onsite conditions
  5. Inspection
  6. On Completion
  7. Record Keeping/ Health Monitoring

godigital-digitaljsa-bannerforswmspages-v3.png 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...