Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604
20% OFF ALL SWMS & SOPS!!!! Ends 5pm 31st July 2017. Enter coupon SAVE20% at checkout.

Driving - Remote Areas SWMS 10

Driving - Remote Areas SWMS 10

Product SKU: 10214
Driving - Remote Areas SWMS 10 Video

Other Details

PDF Download:
Driving_Remote_areas_SWMS_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Includes Vehicle Roll-Over Emergency Response & 4WD Remote Area Checklist
  • You must have Microsoft Word or iAuditor to use this template

Driving - Remote Areas Safe Work Method Statement

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with the operation of a 4wd vehicle in remote areas.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Driving - Remote Areas SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Work carried out adjacent to a road, railway or shipping lane, traffic corridor
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Assess onsite conditions
    • Pre start check
    • Vehicle Operation (Travel)
    • Bushfires
    • Crossing Rivers and Creeks
    • Driving in sand/mud
    • Vehicle Recovery Operations
    • Repairs/Tyre Changes
    • Working outside of vehicle
    • Accidents / Breakdowns
    • Refuelling
    • On Completion
  • Vehicle Roll-Over Emergency Response
  • 4WD Remote Area Checklist
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


  1. Documentation thorough and well done.

    Posted by on

    Excellent documentation covering water crossings, wheel changing and major vehicle recovery options.


$79.95

PLUS GST

View Cart


You May Also Need...