Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Driving (Remote Areas) SWMS 10214-6

Driving (Remote Areas) SWMS 10214-6

Product SKU: 10214
Driving (Remote Areas) SWMS 10214-6 Video

Other Details

PDF Download:
Driving (remote areas) SWMS 10214-6_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Driving - Remote Areas Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with the operation of a 4wd vehicle in remote areas. Includes Vehicle Roll-Over Emergency Response & 4WD Remote Area Checklist.

Job Steps Covered in Driving - Remote Areas SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess travel conditions
  4. Vehicle Operation (Travel)
  5. Bushfires
  6. Crossing Rivers and Creeks
  7. Driving in sand/mud
  8. Vehicle Recovery Operations
  9. Accidents / Breakdowns
  10. Repairs/Tyre Changes
  11. Working outside of vehicle
  12. Contact with insects & retiles
  13. Refuelling
  14. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


  1. Documentation thorough and well done.

    Posted by on

    Excellent documentation covering water crossings, wheel changing and major vehicle recovery options.


$79.95

PLUS GST

View Cart


You May Also Need...