Electrical Renovations Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Electrical Renovations Safe Work Method Statement

This Electrical Renovations Safe Work Method Statement (SWMS) covers hazards and controls associated with the isolation of electrical power, electrical and data rough-in, fitting appliances/fixtures/electrical and data points, and commissioning for shop/office fit-outs and renovations.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Asbestos disturbance
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Electrical Renovations SWMS:

(includes potential hazards & control measures

  1. Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
  2. Planning
  3. Obtain Supply Authority Certificates
  4. Arrival On-site & Assess On-site Conditions
  5. Working Outdoors
  6. Work Area Set-up
  7. Environment
  8. Housekeeping
  9. Manual Tasks
  10. Working with Powered & Non-powered Tools
  11. Hazardous Substance/Chemical Use
  12. Working at Height on Ladders
  13. Working On or Near Energised Electrical Installations or Services
  14. Isolation of Electric Power before Demolition
  15. Switchboard Installation, Test & Commission
  16. Electrical & Data Rough-in
  17. Fitting Appliances, Fixtures, Electrical & Data Points
  18. Test & Commission
  19. On Completion
  20. Emergency Response

 

We've recently reviewed and updated our silica dust controls in line with the new 2023 Code of Practice for Silica Dust hazards in the construction industry. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Electrical Renovations Safe Work Method Statement

This Electrical Renovations Safe Work Method Statement (SWMS) covers hazards and controls associated with the isolation of electrical power, electrical and data rough-in, fitting appliances/fixtures/electrical and data points, and commissioning for shop/office fit-outs and renovations.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Asbestos disturbance
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Electrical Renovations SWMS:

(includes potential hazards & control measures

  1. Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
  2. Planning
  3. Obtain Supply Authority Certificates
  4. Arrival On-site & Assess On-site Conditions
  5. Working Outdoors
  6. Work Area Set-up
  7. Environment
  8. Housekeeping
  9. Manual Tasks
  10. Working with Powered & Non-powered Tools
  11. Hazardous Substance/Chemical Use
  12. Working at Height on Ladders
  13. Working On or Near Energised Electrical Installations or Services
  14. Isolation of Electric Power before Demolition
  15. Switchboard Installation, Test & Commission
  16. Electrical & Data Rough-in
  17. Fitting Appliances, Fixtures, Electrical & Data Points
  18. Test & Commission
  19. On Completion
  20. Emergency Response

 

We've recently reviewed and updated our silica dust controls in line with the new 2023 Code of Practice for Silica Dust hazards in the construction industry. Shop confidently, knowing you're getting the latest, most accurate information for your workplace safety needs.

PDF Download
PDF File

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View