Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Elevated Work Platform (EWP) SWMS 10515-3

Elevated Work Platform (EWP) SWMS 10515-3

Product SKU: 10515
Elevated Work Platform (EWP) SWMS 10515-3 Video

Other Details

PDF Download:
mobile_plant_ewp_swms_10515-2__39178_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • Suitable for Cherry Pickers, Boom Lifts, Scissor Lifts, Aerial Work Platforms and Vertical Lifts
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Elevated Work Platform (EWP) Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards and controls associated with the safe operation of Elevated Work Platforms including scissor lifts, boom lifts, cherry pickers, aerial work platforms, articulating booms and vertical lifts.

Job Steps Covered in Elevated Work Platform (EWP) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Delivery and removal of EWP
  4. Arrival & set-up onsite
  5. EWP Operation
  6. Refuelling on site
  7. On Completion

godigital-digitaljsa-bannerforswmspages-v3.png 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...