Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Fencing (Steel Post and Rail) SWMS 10592-2

Fencing (Steel Post and Rail) SWMS 10592-2

Product SKU: 10592
Fencing (Steel Post and Rail) SWMS 10592-2 Video

Other Details

PDF Download:

  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Fencing - Steel Post and Rail Safe Work Method Statement

This pre-filled Safe Work Method Statement (SWMS) deals with general hazards associated with the installation of steel posts and rail fencing.  Covered in this SWMS is the delivery of materials, line clearing (earthworks), installation posts, cutting and welding rails, construction and hanging of gates.

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Fencing - Steel Post and Rail SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Work carried out adjacent to a road, railway or shipping lane, traffic corridor
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Transporting and loading materials
    • Assess onsite conditions
    • General Work Area Set up
    • Delivery of materials and mobile plant
    • Clear the fence line
    • Mark out the fence
    • Digging post holes
    • Setting the posts
    • Attaching rails and gates
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 


app-store-badge.png       google-play-badge.png


For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews

This product hasn't received any reviews yet. Be the first to review this product!



View Cart

You May Also Need...