Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Fencing (Wire Stranded) SWMS 10352-4

Fencing (Wire Stranded) SWMS 10352-4

Product SKU: 10352
Fencing (Wire Stranded) SWMS 10352-4 Video

Other Details

PDF Download:
Fencing (wire stranded) SWMS 10352-4_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Fencing -  Stranded Wire Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with working with the installation of a stranded wire fence. Covered in this SWMS is delivery of materials, line clearing (earthworks), installation of strainer & running posts, running and straining wire (either plain or barbed wire), and constructing and hanging gates.

Job Steps Covered in Fencing -  Stranded Wire SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Transporting & loading materials 
  4. Assess onsite conditions
  5. General Work area set up
  6. Delivery of materials and mobile plant
  7. Clear the fence line
  8. Mark out the fence
  9. Digging post holes
  10. Strainer /corner posts, pickets
  11. Running out wire / straining wires
  12. Hanging Gates
  13. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...