Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Fire Door Installation SWMS 10106-4

Fire Door Installation SWMS 10106-4

Product SKU: 10106
Fire Door Installation SWMS 10106-4 Video

Other Details

PDF Download:
fire_door_installation_swms_10__28056_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Fire Door Installation Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with the general aspects of fire door installation in residential and commercial buildings. This includes planning, working near powered mobile plant, working with hand / power tools, hazardous manual tasks and on platform ladders. 

Job Steps Covered in Fire Door Installation SWMS:

(includes potential hazards and control measures) 

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival & site assessment
  4. Work area set up
  5. Fitting metal frame, door & hardware
  6. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...