Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Fuel Handling SWMS 10115-5

Fuel Handling SWMS 10115-5

Product SKU: 10115
Fuel Handling SWMS 10115-5 Video

Other Details

PDF Download:
fuel_handling_swms_10115-5_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Fuel Handling Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) covers general hazards associated with fueling powered mobile plant and small engines with petrol or diesel fuel. This includes planning and preparation, environmental controls, working adjacent to mobile plant, training and communications and operational controls for hazards associated with the operation of portable electric and manual fuel pumps.

Job Steps Covered Fuel Handling SWMS:

(includes potential hazards and control measures) 

  1. Planning & Preparation
  2. Training and Capabilities
  3. Transporting fuel to/from & between sites
  4. Filling fuel containers
  5. Site refuelling location
  6. Fuelling powered mobile plant / equipment
  7. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...