Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Glass Splashback Installation SWMS 10600-2

Glass Splashback Installation SWMS 10600-2

Product SKU: 10600
Glass Splashback Installation SWMS 10600-2 Video

Other Details

PDF Download:
glass_splashback_installation_swms_10600-2_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Glass Splashback Installation Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with the handling, movement on site and installation of prefabricated glass splash-backs. This includes screw and adhesive fixing. 

Job Steps Covered in Glass Splashback Installation SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess Onsite Conditions
  4. Delivery, Unloading & Set-up
  5. Installing Splashback
  6. Emergency Response
  7. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...