Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Glass (Vacuum Lifting Attachment) SWMS 10602-2

Glass (Vacuum Lifting Attachment) SWMS 10602-2

Product SKU: 10602
Glass (Vacuum Lifting Attachment) SWMS 10602-2 Video

Other Details

PDF Download:
glass_vacuum_lifting_attachment_swms_10602-2__15411_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Glass (Vacuum Lifting Attachment) Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with the operation of single and multiple suction pad Vacuum Lift attachments. (Vacuum Lifters). This includes planning and preparation, training, prestart and operational controls.

Job Steps Covered in Glass (Vacuum Lifting Attachment) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess Onsite Conditions
  4. Delivery and Removal of Vacuum Lifter
  5. Changing Lifter Attachment
  6. Pre-start Check
  7. Worker Consultation
  8. Lifter Operation
  9. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...