Need a customised SWMS package? Contact us for a free quote or call 1300 306 604
This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls when preparing a surface for repainting that has existing lead paint applied. Covered in this SWMS is lead preparation and removal, working with chemicals, manual handling and environmental waste.
(includes potential hazards and control measures)