Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Make Safe (Boarding-Up) SWMS 10577-2

Make Safe (Boarding-Up) SWMS 10577-2

Product SKU: 10577
Make Safe (Boarding-Up) SWMS 10577-2 Video

Other Details

PDF Download:
make_safe_boarding-up_swms_10__56191_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Make Safe Boarding Up Safe Work Method Statement Scope:

This SWMS is created in response to the needs of first respondents for ‘making safe’ tasks after an emergency event. As such, this SWMS may refer to additional high-risk SWMS for further detail. 

This SWMS provides guidance on making premises temporarily secure after a weather event or an unlawful entry. The SWMS covers the removal and disposal of debris, boarding up doors and windows, applying silicone to cracked glass and changing standard locks.

Job Steps Covered in Make Safe Boarding Up SWMS: 

(includes potential hazards and control measures)

  1. Planning and Preparation
  2. Training and Capabilities
  3. Arrival on Site and Set-up
  4. Remove and Loading Debris
  5. Boarding up Windows and Doors
  6. Silicone Cracked Glass
  7. Changing Locks
  8. On Completion
  9. Unloading Landfill


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...