Need a customised SWMS package? Contact us for a free quote or call 1300 306 604
This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards, risks and controls associated with hazardous manual handling tasks in the building industry. This SWMS also includes a Hazardous Manual Tasks Risk Assessment Form.
(includes potential hazards and control measures)