Need a customised SWMS package? Contact us for a free quote or call 1300 306 604
This SWMS includes information to assist in the identification of effective risk controls with the view of ensuring that all reasonably practicable steps have been taken to prevent the likelihood of incident during the operation of a road/rail excavator on rail tracks; including track re-construction, turnout construction, turnout re-sleepering, re-sleepering and partial re-sleepering as required.
Save time with our pre-filled, fully customisable templates. Simply add your company details and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.
Excavator - Road - Rail - Operation SWMS Content:
For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.
Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.